Swiss Engineered · Lab-Proven · Built for Hockey
Glice Hockey Rink - The Glice Hockey Rink. Synthetic ice that outperforms every alternative.
Lab-proven by Fraunhofer to deliver 52% less friction and 45% less indentation than the next best competitor. Train harder, longer, year-round.
Trusted by CCM, Harvard and elite hockey programs across 100+ countries.
Glice is a Swiss-engineered synthetic ice rink system — solid polymer panels that deliver a real skating experience using regular ice skates, with no refrigeration, no water, and no electricity. Installed in over 3,000 rinks across 100+ countries, with performance independently validated by Germany’s Fraunhofer Institute.
Reviewed by Viktor Meier, Co-Founder & CEO, Glice AG · Last reviewed: June 2026
Skating. Without Ice.
Synthetic ice is a system of engineered polymer panels that lets you skate with normal ice skates - no refrigeration, no water, no freezing. Panels install on any flat surface and connect to form a complete skating rink. Operable anywhere, in any climate.
How Hockey Benefits from a Glice Rink or Training Center
More Ice Time - No Slot Competition
No fighting for rink slots, no downtime for resurfacing, no Zamboni. Your ice is always available - players step on and train whenever they need to.
More Repetitions = Faster Player Development
Year-round access means more drills, more edge work, more game-speed reps per week. No dependence on arena season - your programme runs 365 days.
Install Anywhere, Indoor or Outdoor
No refrigeration infrastructure required. Garage, warehouse, arena, or backyard - install on any flat surface and start skating in hours.
Dramatically Lower Cost Per Hour
Eliminate ice-time fees, rink rental, and refrigeration costs. A Glice rink delivers a fraction of the cost per skating hour vs. leased arena time.
Identical Glide. Zero Infrastructure.
Independent Fraunhofer testing confirms a friction coefficient matching freshly resurfaced real ice at lower speeds.
Source: Fraunhofer IWM, Zwischenbericht V1184-2025
Not All Synthetic Ice Is Equal.
Fraunhofer lab tests confirm Glice leads every performance metric in the category.
Source: Fraunhofer Institute for Mechanics of Materials IWM, Freiburg. Zwischenbericht V1184-2025.
It's the best way to skate and shoot like you're on real ice.
Glice is a great tool to be on and work on my skills.
Glice is the best synthetic ice I've ever worked on. It replicates the feel of real ice better than anything else on the market.
Glice gets extremely close to real ice. Once you play on it, you forget that you are on synthetic ice.
We're simulating exactly what we would do on the ice. Glice is as close as it gets to the true ice experience.
A Swiss company has come up with a completely synthetic ice that has the same glide coefficient and therefore the same feel.
Recognised on the World Stage.
Selected by leading sports organisations to showcase the future of ice sports.
Quality Players Can Feel.
Compared to conventional synthetic ice, the difference is immediate.
Every detail is engineered for serious training.
Effortless Glide
52% lower friction than the next-best synthetic ice (Fraunhofer-validated). Players get a realistic skating feel that translates directly to game ice.
Blades Stay Sharp
45% less blade indentation means skates stay sharper through longer sessions - less time at the sharpener, more time on the ice.
Clean Surface
6% less abrasion than the next-best competitor. Minimal shavings, much less shavings sticking to clothes or scattered around the rink - a surface worthy of a pro facility.
Glice is engineered to protect the training experience you invested in - from the first session to the thousandth.
Proven by Hockey Programs Worldwide.
Clubs, coaches, and training environments use Glice to keep athletes skating across seasons.
Free Planning Guide
Get The Complete Rink Planner.
Everything you need to evaluate, plan, and launch a synthetic ice rink - in one document.
- Site requirements and Planning Checklist
- Six financing paths, including grants and sponsorship
- How to test, compare, and choose any provider
A Rink Your Team Can Run.
No refrigeration. No engineers. No complexity.
Running a skating rink should not require specialists. Glice is designed so your existing staff can install, operate, and maintain it with minimal effort.
Installs on any flat surface
Concrete, asphalt, sport flooring, event flooring. No permits required.
Ready in hours
Modular system assembled by your team, not contractors.
No ice plant, no resurfacing water
No refrigeration infrastructure. No water consumption.
Minimal maintenance
Simple daily cleaning with one machine. No technical staff required.
Staff trained in 45 minutes
Glice Rink Manager Certification included.
Stackable storage
Full rink packs flat in Glice FlatPacks™ for off-season.
Our Rink Systems
From backyard training setups to full-size professional arenas - every system is Swiss-engineered and built to last.
Glice Pro Rink
Add serious ice time to your facility. Available in any dimension and configuration.
Glice Hockey Center
Elite-level skill development - built for players who train to compete. Available in any dimension and configuration.
Glice Hockey Training Rink
Dedicated hockey training surface for skill development. Available in any dimension and configuration.
Glice Home Rink
Professional training at home, every day. Available in any dimension and configuration.
Sustainability Built In
A Rink That Plants a Forest
170,000+
Trees Planted and Counting
For every panel we produce, a tree gets planted. Through Skate for the Planet, Glice's reforestation program, 170,000+ trees have been contributed to verified reforestation - currently in partnership with Trees for the Future, a UN World Restoration Flagship. Your hockey rink comes with a verified ESG line item for sustainability reporting from day one.
As Seen In
From Idea to Rink. Fully Guided.
A clear, structured process from first concept to successful community launch.
Consultation
Define goals, evaluate your space, outline size and configuration.
Planning & Funding
Budget support, sponsorship guidance, council presentation.
Production
Manufactured to specification. 4–12 weeks.
Installation
Glice supervisor on-site with your local team.
Training & Launch
Staff Training & Certification. Ongoing support.
Frequently Asked Questions
The second cost is operational. Lower-grade panels demand far more frequent sharpening, driving up labor and consumables. Worse, inconsistent blade results feed the same dissatisfaction loop - skaters blame the ice, but the surface is chewing up their edges.
Then there's durability: faster wear, earlier replacement, shorter lifespan. By the time those costs land on the balance sheet, the revenue and reputation damage is already done. A lower upfront price almost always ends up being the more expensive decision.
Working with Glice was different from any supplier relationship we had. They guided us through every step and made a complex project feel completely manageable.
Plan Your Rink. Get Personal Advice.
Takes 30 seconds. Get the Complete Rink Planner instantly - or add a specialist consultation for personal advice.
We've filled in your details from earlier. Just add anything extra below.
Key facts
- Fraunhofer IWM measured Glice friction matching freshly resurfaced real ice at lower speed
- 52% less friction and 45% less blade indentation than the next-best synthetic ice competitor
- Operating in 100+ countries with 3,000+ installations
- Swiss-engineered panels manufactured in Germany under exclusivity
Last updated: June 2026
Low glide
Blade dulling
Excess shavings
Poor aesthetics




















